  • Capacity of the kitchen 90 Person can cook same time
  • Water line 1Km, Gas line 400 meter
  • Special safety system Gas detector installed, fire back arrestor system
  • Project completed in 45 days (civil to commissioning)
  • No fatality, safely delivered the project